How much sand and cement for mortar?

Straight mortar quantities, either from a volume or from a unit count. The mix presets are the ones off the old sheet: below DPC inside and out, above DPC inside and out.

Measure it

Every box has its own unit next to it.

Check the rates

Rates and assumptions used

These are the figures the calculator works to. Change any of them and the order list updates — your merchant’s pack sizes and your own waste allowances beat the defaults every time.

How this one works

The figures the calculator works to. Every one can be changed in step 2, and your merchant’s pack sizes and your own waste allowances beat these defaults every time.

RateDefaultWhy
Sand density1.6 t/m³
Dry-to-wet factor1.3Dry sand and cement to mixed mortar.
Bag size25 kg
Sand bulk bag0.85 t

A worked example

With the defaults the page opens on:

  • What are you starting from? A volume of mortar
  • How much mortar? 1 cubic metres
  • How many bricks or blocks? 1500 number
  • Brick or block? Brick — 1.0 kg sand each
  • Which mix? 3:1 — below DPC
  • Spare for waste 10 per cent

Mix 3:1

  • Waste allowance: 10 %
  • Building sand: 1.72 t — 1,716 kg
  • Sand bulk bags: 3 bags — 1.7 / 0.85 tonnes a bag
  • Cement: 23 bags — 572 kg ÷ 25 kg
  • Hydrated lime: none — use a plasticiser
  • Covers roughly: 29 m² brickwork — at 60 bricks/m², 1 kg sand each
  • or: 95 m² blockwork — at 10 blocks/m², 1.8 kg each

Change any figure above and every line recalculates; the small print under each row is the sum that produced it.

Questions people ask

How much mortar per 1,000 bricks?

About a tonne of building sand at 1 kg per brick, before waste. Blocks take about 1.8 kg each. Pick the unit route, enter the count, and the cement and lime follow from the mix.

Which mortar mix should I use?

Richer below DPC where it stays wet (3:1), softer above so the mortar fails before the brick does (4:1:1 internal, 5:1:1 external). The presets are the ones from the old site sheet; the right mix for a particular wall is the specification’s call.

Why 10% waste on mortar?

It is the easiest material on site to waste - what goes off on the spot board. 10% is the default; change it.

What if I have no lime?

The 3:1 and 4:1 presets have none and the page says to use a plasticiser instead. Where a preset includes lime, it is shown in 25 kg bags.

Calculators for the same job