Concrete & screed · m³ · loads

How much concrete do I need?

Volume for a slab, base or raft, with waste, rounded the way the batching plant sells it. Under-order and you are paying for a second part-load and a cold joint.

Measure it

Every box has its own unit next to it.

Check the rates

Rates and assumptions used

These are the figures the calculator works to. Change any of them and the order list updates — your merchant’s pack sizes and your own waste allowances beat the defaults every time.

How this one works

The figures the calculator works to. Every one can be changed in step 2, and your merchant’s pack sizes and your own waste allowances beat these defaults every time.

RateDefaultWhy
Full load6 m³A full mixer. Some plants run 8 m³ wagons.
Concrete density2.4 t/m³Normal-weight concrete.
Order step0.25 m³What the plant batches in.
Barrow volume80 LA full builder’s barrow. You will not fill it every time.

A worked example

With the defaults the page opens on:

  • How long is the slab? 8 metres
  • How wide is it? 5 metres
  • How thick is it? 150 millimetres
  • Any extras to add on? 0.4 cubic metres
  • Spare for waste 7.5 per cent

Volume

  • Slab area: 40 m²
  • Net volume: 6.4 m³ — area × thickness + extras
  • Waste allowance: 7.5 %
  • Order quantity: 7 m³ — rounded up to 0.25 m³
  • Weight: 16.8 t — × 2.4 t/m³

Deliveries

  • Full loads: 1 × 6 m³
  • Part load: 1 — part loads usually carry a surcharge
  • Barrow runs: 88 barrows — if it is wheeled rather than pumped

Change any figure above and every line recalculates; the small print under each row is the sum that produced it.

Questions people ask

How much concrete do I need for a slab?

Length × width × thickness, plus any thickenings or downstands, plus waste. A 8 m × 5 m slab at 150 mm is 6 m³ before extras; the calculator adds your waste allowance and rounds up to the quarter-metre most plants batch in.

How much waste should I allow on ready-mix?

The default is 7.5%. Use 5% on a clean, level formation and 10% on hardcore, because the undulations in a hardcore bed swallow more than people expect.

What is a full load of ready-mix?

The calculator assumes a 6 m³ mixer; some plants run 8 m³ wagons. Anything left over after the full loads is shown as a part load, which usually carries a surcharge - it is often cheaper to add a thickening than to pay for a part load.

How many barrows in a cubic metre?

About 13, at 80 litres to a full builder’s barrow. You will not fill it every time, so the calculator’s barrow count is a floor, not a promise.